CS Tech Installation Site

PROCESS & ENGINEERING

Beyond Filter Supply —
We Own the Entire Line

30+ Years

Field Experience

500+

Installation Projects

ZERO

Unfinished Projects

4 Hours

Avg Emergency Response

OUR PROCESS

From On-Site Survey to After-Sales
A Complete 6-Step Process

01

On-Site Survey

Water quality analysis, flow/pressure/temperature measurement, and assessment of existing equipment. On-site surveys are conducted free of charge.

02

Design & Quotation

Optimal filter combination designed based on survey data. Housing, piping, and pump specifications finalized along with quotation submission.

03

Material Procurement

In-house manufactured filters and premium domestic & international materials sourced. Standard delivery: 5–10 business days.

04

Installation

Piping installation, housing & pump setup, electrical & instrumentation connections. Clean installation standards applied for high-sanitation processes.

05

Commissioning & Inspection

Flow, pressure, and water quality measurement. Handover only after 100% verification of design specifications. Completed with customer sign-off.

06

After-Sales Handover

Periodic inspection schedule established, filter replacement reminders provided, and emergency dispatch system explained. A continuing partnership thereafter.

CASE GALLERY

500+ Sites — See for Yourself

Food & Mineral Water Production Lines

Food & Mineral Water Production Lines

Full HACCP-compliant sanitary line installation

Raw Water Tank & Piping Installation

Raw Water Tank & Piping Installation

Large-capacity raw water tanks and stainless steel piping

Maple Sap RO System

Maple Sap RO System

Turnkey RO sterilization & concentration equipment

Seawater Desalination RO+UF

Seawater Desalination RO+UF

Seawater UF pretreatment + desalination RO system

On-Site Surveys Are Free

Share your water quality, flow, and pressure conditions and we'll schedule a same-day visit.

031-365-3608Online Inquiry